Bathroom Renovation in London

Complete bathroom renovations across Greater London, from layout and first fix through waterproofing, tiling and final commissioning.

What a bathroom renovation involves

A renovation changes how the room works rather than just what is in it. Moving a WC or shower, removing a bath to gain a walk-in enclosure, or borrowing space from a cupboard are all renovation decisions, and each one has consequences for drainage falls, floor build-up and ventilation that are settled before anything is ordered.

Waste is the constraint that shapes most London layouts. Soil pipes need consistent fall, and how far a WC can move depends on the distance to the stack and the depth available beneath the floor. In converted flats the stack position was often fixed when the house was divided, which is why the survey establishes it before a layout is drawn rather than after.

The order of work is what determines whether the result lasts. Strip out, first-fix plumbing and electrics, structural preparation, tanking where the room needs it, tiling, second fix, then sealing and commissioning. Once the walls are boarded, every pipe, cable and fixing position is settled, so shower valve heights, socket positions and the noggins carrying a wall-hung basin all have to be decided before that point.

Floors decide what is possible. Solid floors take almost any finish. Timber floors deflect, and large-format tiles, stone trays and continuous finishes do not tolerate deflection, so the structure is stiffened or the specification changes. In Victorian and Edwardian conversions this is the single most common reason a specification has to be revised, and it is far cheaper to find at survey than after the tiling cracks.

Strip-out also exposes what previous work concealed: unsealed junctions, a floor levelled with compound rather than repaired, or timbers affected by a long-standing leak. Dealing with that properly is the difference between a renovation and a recovering, and it is quoted openly rather than absorbed quietly.

Common questions

Can the toilet be moved to a different wall?

It depends on the fall available to the soil stack. Waste needs a consistent gradient, so how far a WC can move is set by the distance to the stack and the floor depth available to run in. Basins and showers are more forgiving, which is why they usually move first when a layout is reworked. In a converted flat the stack position is often the fixed point the whole layout is planned around.

How long is the water off during the work?

Only during first fix and second fix, not throughout. Supplies are isolated while pipework is altered and reconnected, and outside those stages the rest of the property keeps normal use. Where there is only one bathroom, the sequence is planned around that rather than leaving the room stripped between stages.

What usually causes a bathroom project to grow beyond its original scope?

What is found behind the surfaces. An unsealed wet zone, a floor previously levelled rather than repaired, pipework that cannot be reused, or timbers affected by a slow leak. A structural survey before pricing keeps that to a minimum, though it cannot eliminate it entirely on an older property.

London Coverage

Free quotes, free site surveys and direct project advice.

We work across Greater London on residential and commercial interiors, from single rooms to full property refurbishments. Every quotation follows a site survey and is itemised, separating materials from labour.

Free QuotesFree Site SurveysItemised Fixed-Price QuotationsResidential & Commercial Projects

Get an itemised bathroom quotation

Send dimensions, what is there now and what you want changed, and we will arrange a survey and a fixed-price quotation.

CallWAFree QuoteSite Survey